schlüchterner

Schlüchterner Tunnel, Germany

Where existing and new structures comes together: RAILONE Engineering for the highest safety standards For the modernisation of the Schlüchtern Tunnel, RAILONE supplied the RHEDA 2000® and GETRAC® A3 systems and developed an EBA-approved access system, supporting the safe implementation of…

Read More
peissen2

Hohenthurm – Peißen, Germany

GETRAC® A3 for Easy Installation in Winter Conditions For the renewal of the track superstructure on the Hohenthurm–Peissen section, RAILONE supplied the GETRAC® A3 ballastless track system between December 2016 and April 2017. The track superstructure on the Hohenthurm–Peissen section was…

Read More
Brandleittunnel

Brandleitetunnel, Germany

GETRAC® A3 for Higher Speeds and a Reduced Construction Height in the Brandleite Tunnel In 2005, RAILONE equipped the approximately three-kilometre Brandleite Tunnel near Oberhof with 6.3 km of the GETRAC® A3 ballastless track system, enabling higher speeds and the use…

Read More
Lehmsief

Lehmsief, Germany

GETRAC® A3 for Challenging Ground Conditions Between 2015 and 2016, the line in Lehmsief, Germany, was renewed using the GETRAC® A3 ballastless track system, designed for challenging ground conditions and particularly low construction heights. In the Lehmsief area, the Stolberg–Herzogenrath line…

Read More