Where existing and new structures comes together: RAILONE Engineering for the highest safety standards For the modernisation of the Schlüchtern Tunnel, RAILONE supplied the RHEDA 2000® and GETRAC® A3 systems and developed an EBA-approved access system, supporting the safe implementation of…
RAILONE thresholds with rubber soles for various national long-distance transport companies
A Proven Design Benefiting the Environment and Local German Communities Since 2006 Since 2006, RAILONE has supplied approximately 1,400 km of sleepers with under-sleeper pads to rail operators in various countries. This is equivalent to around 540,000 sleepers. Watch video Watch…
Pilot Installations: Oberhausen, Westerland, and other locations, Germany
Initial Pilot Installations and Further Development of the Hinged Turnout. The hinged turnout was installed for the first time in 2011 and subsequently tested at more than 40 locations. A further-developed cast version offering greater stability and cost-effectiveness received EBA approval…
B70 for various international long-distance rail operators.
B 70: A GLOBAL CLASSIC FOR BALLASTED TRACK Concrete sleepers must withstand high loads and extreme climatic conditions while providing a long service life with minimal maintenance requirements. The B 70 meets all these demands with ease. Its product name reflects…
Rapur-Tunnel, Andra Pradesh, India
Efficient Rail Solutions for the Rapur Tunnel with RHEDA 2000® Between November 2018 and August 2019, PCM RAILONE supplied 12,500 RHEDA 2000® bi-block sleepers for the 6.5 km Rapur Tunnel near Chennai, India, helping to improve logistics from the Port of…
Mekka-Medina, Saudi-Arabia
RHEDA 2000® Protects Against Sand Accumulation For a high-speed line through the desert regions of Saudi Arabia, RAILONE supplied approximately 210,000 RHEDA 2000® sleepers and 500,000 sleepers for ballasted track, designed for speeds of up to 320 km/h. RAILONE also supported…
Amsterdam-Antwerpen, Netherlands/Belgium
RHEDA 2000® for a Wide Range of Route Characteristics Between 2002 and 2006, RAILONE supplied RHEDA 2000® bi-block sleepers and engineering expertise for 88 km of the Dutch high-speed line between Amsterdam and Antwerp. HSL Zuid is the Dutch section of…
Hohenthurm-Peißen, Germany
GETRAC® A3 FOR EASY INSTALLATION IN WINTER CONDITIONS Between December 2016 and April 2017, RAILONE renewed approximately 4.7 km of track superstructure on the Hohenthurm–Peißen section using the GETRAC® A3 system. More than 14,500 sleepers were supplied, helping to ensure the…
Etihad, VAE
Double Performance: RHEDA 2000® Combines Heavy Haul and High-Speed Rail In summer 2022, RAILONE completed the installation of 7,120 m of RHEDA 2000® in the strategically important Etihad tunnels in the UAE, designed for both heavy haul and high-speed rail operations….
Taiwan Highspeed Rail
High-Speed Rail Across 345 Kilometres: RHEDA 2000® for Taiwan’s Landmark Project Since 2007, RHEDA 2000® has enabled speeds of up to 300 km/h on the 345 km Taiwan High Speed Rail line, supported by more than 125,000 bi-block sleepers and RAILONE’s…









